Laserfiche WebLink
C <br />Colorado Division of Minerals and Geology <br />sheet 7 of 5 <br />NE7 PROJECT XOURS - JOB SUPERINTENDENT COS7 ESTIMATING FORM <br />TASK NO.: 100 PREP BY JRS <br />DATE 1-Jun-2000PERMIT M: C-81-022 <br />TASK FILE NAME C022-100 <br />OPERATION Sanborn Creek Mine <br />PERMIT ACTION Technical Revision 32 - New Elk Creek Facilif ies <br />TASK DESCRIPTION Job Superintendent Nours <br />• <br />r~ <br />TASK ~ ~ TASK ~ EQUIPMENT ~ CPM ~ NET <br />NUMBER ~ TASK DESCRIPTION ~ XOURS ~ USED ~ <br />oea CXARiING ~ <br />.=_ eee.... <br />.. JOB XOURS <br />e..........el <br />1 ~ ee=ee.eeeeeeeveeev......ee.e.........=e...vee.Bevel= <br />Regrade Elk Creek Facilities Area ~ eeeee._eee <br />1,849.92 leveee <br />~ CAT l <br />eee <br />D8N ~ I <br />--------->~ .e e....=_ <br />924.96 <br />2 ~ Regrade Sanborn Creek Facilities Area ~ 64.90 ~ CAT D8N ~ --------->~ 32.45 <br />3 ~ 8ackfill Substation No. 3 Pad and Sediment Pond ~ 9.73 ~ CAT D8N ~ ---••---->~ 4.87 <br />4 ~ 8ackfill Meteri els Used to Widen Access Road ~ 10.43 ~ CAT D8N ~ -----••-->~ 5.22 <br />5 ~ Regrade Elk Creek Mine Area ~ 931.94 ~ CAT DBN ~ ----••-••>~ 465.97 <br />b ~ Move Fill Material from Elk Creek Mine to Elk Crel 238.87 ~ CAT 637E ~ 238.81 ~ 0.00 <br />~ <br />8 ~ ~ <br />Regrade West Palley Fill ~ <br />16.99 ~ <br />~ CAT ~ <br />D8N ~ ~ <br />-----••-->~ <br />8.50 <br />9 ~ Haul Cover for West Palley Fill ~ 8.53 ~ CAT 637E ~ 8.53 ~ 0.00 <br />10 ~ Re9rade Refuse Pile to Final Contours ~ 54.15 ~ CAT D8N ~ --------->~ 27.08 <br />11 ~ Distribute Overburden on East Refuse Pile ~ 17.81 ~ CAT 637E ~ 17.81 ~ 0.00 <br />72 ~ Xaul Stockpile Aree "Footprint" to Refuse Aree ~ 32.35 ~ CAT 637E ~ 32.35 ~ 0.00 <br />13 ~ Haul Temporary Refuse Pile to Yest Valley Fill ~ 4.99 ~ CAT 637E ~ 4.99 ~ 0.00 <br /> 0 <br />16 ~ Conpact Steep Slope Areas erd CoeL Stockpile Natal 156.03 ~ CAT 8158 ~ 156.03 ~ 0.00 <br />17 ~ Conpact Ungraded Refuse Material ~ 7.04 ~ CAT 8158 ~ 7.04 ~ 0.00 <br />~ <br />20 ~ ~ <br />Rip Cover Material for Eest Refuse Pile ~ <br />73.26 ~ <br />~ CAT ~ <br />OBN ~ ~ <br />--------•>~ <br />36.63 <br />27 ~ Rip All Surface Facility Areas ~ <br />~ 154.49 ~ CAT <br />~ 08N ~ <br />~ --------->~ <br />~ 77.25 <br />24 ~ <br />~ Reclaim Lower hubbard Creek Access Road ~ 4.86 ~ CAT D8N ~ ------•-->~ 2.43 <br />25 ~ Reclaim Bear Creek Aceess Road ~ 6.07 ~ CAT DBN ~ --------->~ 3.04 <br />26 ~ Rip and Regrade C-Seam Access Road ~ 5.60 ~ CAT D8N ~ •-------->~ 2.80 <br />27 ~ Regrade Lower Power Line Aceess Road ~ 36.30 ~ CAT 350 ~ 36.3 ~ 0.00 <br />28 ~ Regrade Pond C Aecess Roed ~ 27.88 ~ CAT D8N ~ --------->~ 13.94 <br />31 ~ Final Grade All Disturbed Areas ~ 60.71 ~ CAT 14G ~ 60.71 ~ 0.00 <br /> ~ ~ ~ ~ D I <br />34 ~ Reconstruct/Riprap Lower Hubbard Creek ~ 53.55 ~ CAT 350 ~ 53.55 ~ _ 0.00 <br />35 ~ Excavate for Lower hubberd Creek Riprap Placement) 8.98 ~ CAT 350 ~ 8.98 ~ 0.00 <br />36 ~ Reconstruct/Riprap Bear Canyon ~ 28.90 ~ CAT 350 ~ 28.9 ~ 0.00 <br />37 ~ Excavate for Bear Creek Riprap Placement ~ 1.33 ~ [AT 350 ~ 1.33 ~ 0.00 <br />38 ~ Reconstruct/Riprap Etk Creek ~ 482.58 ~ CAT 350 ~ 482.58 ~ 0.00 <br />39 ~ Extavate for Elk Creek Ri prop Placement ~ 795.56 ~ CAT 350 ~ 195.56 ~ 0.00 <br />42 ~ Remove Upper hubbard Creek Sediment Pond ~ 9.03 ~ CAT D8N ~ --------->~ 4.52 <br />43 ~ Remove East Beneh Pond ~ 2.10 ~ CAT D8N ~ --------->~ 7.05 <br />44 ~ Excavate/8ackfill Pond C WaIL ~ 2.74 ~ CAT 350 ~ 2.74 ~ 0.00 <br />45 ~ Regrade Yest Valley Fill Diversion ~ 1.65 ~ CAT 350 ~ 1.65 ~ 0.00 <br />_ _______________________:__:_____________:__________ _______________________:_==:==svevvv______________________~ <br />TOTAL TASK XOURS - p. 1: 4,559.21 NET P0.OJECT HOURS- p.1: 1,610.71 <br />