Laserfiche WebLink
TAS.L 75 <br />PAGE 2i4 <br />SiHi-1 - Concrete required - 45 bags z ;4.50/bag = ;202.50 <br />Labor E8.00/hr. z 2 hra = 1b.00 <br />Travel time 0 <br />Miscellaneous (includes seed) 50.00 <br />Total bacl~ill costs ;270.00 <br />Total Hone Hole Reclamation Coate - ; 20.00 <br />4. Pad Grading <br />4.1 Recede site to final contour <br />4.1.1 Amount of material to bs g~aded 18,00 n.y. <br />4.1.2 Production factors - Caterp111ar 220 o.y./hr. <br /> D-8L dozer3 r/1 Dniveraal blade, <br /> 180 foot heal distance <br /> Operator efficiency .90 <br /> JoD efliciaaoy .90 <br />• Est. production rata 178.2 c. y./hr. <br />4.1.3 Total Dom[ time 101 hr. <br />4.2 Ramous topsoil from pile and haul to pad <br />4.2.1 amount of topsoil 4,600 o.y. <br />'4.2.2 Production factors - Caterpillar <br /> 613C Soraper3 v/11 ou. yd. capacity <br /> 700 foot heal distaaoe <br /> Load time - .9 minutes <br /> Spread time - .7 minutes <br /> travel full - .6 minutes <br /> Traral empty - _4 ainutss <br /> Total cycle tam = 2.6 minutes <br /> JoD efficiency .78 <br /> Est. production rate 195 c. y./hr. <br />4.2.3 Total 613C time 23.6 hrs. = 24 hrs. <br />. 4.3 Spread topsail <br />4.3.1 Amount of topsoil 4,600 c.y. <br />