Laserfiche WebLink
TASR 75 <br />PACE 1/4 <br />• IIPPER HDBHARD CREEE FAN SITE - REGI.AHATZON PLAN <br />COST ESTIHATE <br />Technical Revision Ho. 1 <br />1. Structures Demolition <br />1.1 Structure Volume <br />!Betel Buildings 0 o.f. <br />Fan Pada 0 o.y. <br />aSubatation Pad 0 c.y. <br />1..2 Total Demolition Coat <br />• <br />2. Culvert Removal <br />2.1 Fill to ba moved <br />2.2 Prodnatioa rate - Caterpillar <br />225 Enca~ator3 <br />Job efficisnoy .90 <br />Eat. production rats <br />2.3 Total 225 time <br />2.4 Coat as 225 x/operator <br />2.5 Total onlvart removal coat <br />IIait Cost <br />X0.14/cf1 <br />Total Cost <br />0 <br />0 <br />0 <br />0 <br />65 c.y. <br />112 o.y./hr. <br />101 c.y./hr. <br />1 hr. <br />#63.76 <br />!64.00 <br />~ Substation pad will remain in place but x111 be covered and <br />reseeded. <br />3. Backfill Shafts <br />No ahafta xare oonatructed at thLs site. -11 Boreholas located on <br />the IIpper Hubbard Creek pad have bean reclaimed xith the nzcaption of <br />H-10. This xall x111 remain open for hpdrologic monitoring. The <br />alluvial wall Yl4t-1 x111 also remain open for monitoring. <br />3.1 H-10 - Comrate required - <br />Labor - <br />Travel lima <br />Packing sad rebar <br />Hiscellaaeoua (includes seed) <br />Total bac1di11 costs <br />22 Raga z ;4.50/ha8 = 4 99.00 <br />~8.00/hr. z 6 hrs. s 64.00 <br />'8.00/hr. z 2 hrs. s 16.00 <br />50.00 <br />25.00 <br />X254.00 <br />CJ <br />