Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />E STIMAi1NG FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />_________________________________________________________ <br />_________________________________________________________ <br />Task #... 007 Prep. by ESC Filename..M042-007 <br />____________ ________ __________ <br />Date..... 11-AUg-99 Permit # M-99-042 Mi ne......uhite Banks Nine <br />Permit Action........ Neu 110(2) Permit <br />___________________________ <br />Task Description..... Mobilization/Demobilization <br />HIXIR LY EQUIPMENT COST <br />_____________ ________ NOTE - ih is is a list to sel e[[ from, not a list of mandatory items to inc lude. <br />Mob/Demob Eqp . -Tract or 6x4, 75,000 lb GVw, 375 HP, diesel powered <br /> -Lt. frailer 25 ton folding gooseneck, drop deck <br /> -Med, frailer 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding goosencc k, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoli ne powered <br /> -Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -flatbed Truck: 30,000 Ib Gvu, 210 RP, diesel powered <br />Last Update: ________________________________ __________ ______________________ _.,________ ___________ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <br />_____________________ <=25 7, <br />__________ 26-50 T. > 50 T. Car <br />________________________________ Crane <br />__________ Truck <br />______________________ Truck <br />__________ Truck <br />___________ <br />_____________ <br />Ownership ________ <br />Cost/hr __________ <br />= 825.59 ________________________________ <br />528.10 (31.38 51.73 __________ <br />524.12 ______________________ <br />56.88 __________ <br />512.66 ___________ <br />57.88 <br />Operating Cost/hr = 528.38 (30.17 832.34 54.82 (31.48 519.57 525.56 f11.82 <br />Operator Cost/hr = 522.61 522.61 422.61 521.82 523.13 522.35 521.24 522.35 <br />Helper Last/hr = (21.82 521.82 (21.82 50.00 80.00 50.00 50.00 50.00 <br /> Total = 598.40 5102.70 5108.15 528.37 578.73 548.80 559.46 542.05 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- neigh[ Ownership Raul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description <br />____________________________ (tons) <br />____________ Lost/hr <br />___________ Lost/hr <br />____________ (no. hauled) Lost/hr <br />___________________________ Cost/hr <br />_______________ Cost/ea <br />___________ <br />____________________________ <br />CAi D8N Dozer ____________ <br />53.00 ___________ <br />843.08 ____________ <br />5108.15 ___________________________ <br />1 f151.Z3 _______________ <br />5108.15 ___________ <br />f0.00 <br />Revege[ation Equipment 20.00 560.00 598.40 1 5158.40 598.40 50.00 <br />_____________________________________________________________ <br />_____________________________________________________________ <br />Subtotals 5309.63 5206.55 50.00 <br />