Laserfiche WebLink
Compaction <br />Test Report <br />• <br />\J <br />cuENr. BASIN RESOURCES, INC. <br />14300 HIGHWAY 12 <br />WESTON, COLORADO 81091 <br />® CTL/THOMPSON, INC. <br />CONSULTING GEOTEGHNICAL <br />AND MATERIALS ENGINEERS <br />w,E 11/16/95 loa No. 22905 <br />R`~ORINO 4 SHEET 20F_ 3._ - <br />$ceLECr FIELDDENSiTYTESTS - - <br />REFUSE DISPOSAL AREA <br /> UBORATORY FIEID <br />TEST <br />NO. <br />LOCATION DEPTH <br />iEET <br />T 1ESi <br />TYPE MAX <br />DENSIN <br />PCF OMC <br />a DRV <br />DENSITY <br />PCF MC <br />.e COM- <br />PACTION <br />e <br />SOIL TYPE <br />37 NEW ELK RDA- - 7520 NUC 96.0 10.0 92.0 14.3 96 JOB N0.22905 <br />38 NEW ELK RDA 7477 NUC 96.0 10.0 97.0 11.8 100 JOB N0.22905 <br />39 NEW ELK RDA -- 7500 NUC 96.0 10.0 99.0 12.3 100 JOB N0.22905 <br />40 NEW ELK RDA 7460 NUC 96.0 10.0 104.0 8.1 100 JOB N0.22905 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EttvwnoN w FEti <br />SPECIFICATIONS:-90 %OF MAXIMUM ~M D 698 <br />MOISTURE WITHIN °o OF GPiIMUhI <br />TYPE OF COMPACTION E9UIPMENT AND NO OF UN115 <br />MOISTURE ADDED BY_ <br />THICKNESS OF LIFT <br />TYPE OF EARTH MOVING E9UIPMENi AND NO.OF UNITS <br />IrICHES <br />IRIS REPORT PRESEN6 OPINIONS FORMED A$ A RESULT OF OUR OBSEINARON <br />GF FIIL PLACEMENT A$ WELL AS THE 1E5i5 SHO.vN ABOVE WE HAVE RELIED <br />UPON THE COrltRA00R iO APPLY THE NECESSAM COMPACIME EFFORT ANp <br />NIOISNRE i0 ACwEVE SPEOFlED COMPACTION DURING TIMES WHEN OUR <br />OBSERVER 15 NOr PRESENT. AND AT LOGTTIONS OMER THAN (HOSE TESTED <br />TEST DATA ARE NOi ME SOLE 84515 FOR OPINIONS ON WHETHER THE FILL MEETS <br />sPEOHCanoNs <br />PROGRESS REPORT (CONTINUED FROM SHEET 1 OF REPORT 4) AT THE WEST END OF THE PILE THERE WERE NUMEROUS <br />END DUMP PILES AND R DID NOT APPEAR AS THOUGH THIS AREA HAD BEEN LEVELEDED AND COMPACTED AT THE <br />TIME OF OUR VISR. WEATHER CONDff10NS, AT THE TIME OF OUR VISR, WERE CLEAR, SUNNY, AND WARM; 70 <br />DEGREES FAHRENHER, WiTH A LIGHT BREEZE. R APPEARED PS THOUGH THE Siff FWD BEEN DRY FOR SUITE A <br />WHILE, AS THERE WERE NO EXCESSNELY WET OR SOFT AREAS ON THE FILL. THE CONTRACTOR WAS PLACING <br />MATERIAL IN THE NEW ELK RDA AT THE TIME OF OUR VISR AND WAS USING THE DOZER TO SPREAD AND COMPACT <br />THE MATERIAL PLACED BY THE 2 DUMP TRUCKS. (CONTINUED ON SHEET 3 OF REPORT 4) <br />^ IN OUR OPINION FIIL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND iESiN0.151 _._ <br />^ IN OUR OPINION FILL COMPACTION DOES N0I MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST N0.151- <br />• AND SHOUID BE REWORKED <br />SCOPE OF OBSERVATION: ^ FULL TIME; LX PERIODIC, ON CALL BASIS: FX CONTRACTOR'S OR CLIENT'S REPRESENTATIVE ADVISFD RALPH LOPEZ <br />(AIM <br />PAUL WIGGS <br />HELD REPRESENTAfNE <br />PR:MGG:BAS <br />CTL: THOMPSON, INC <br />„ooRweoe~ MARK G. GRAY, P. <br />