My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137694
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:19 PM
Creation date
11/26/2007 6:24:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
7/15/2002
Doc Name
Environmental Assessment, Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR96
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coa(Mefhane Drainage Projeet - Panek 16-24 Wert E!k Mine • Page 2-75 <br />disturbed areas. The responsible USFS official shall give final approval for decommissioned <br />condition and permanent closure devices for reclaimed roads. <br />48) MCC will be required to implement appropriate restoration measures if a stream or riparian <br />area is damaged <br />49) Salvaged soil materials will be replaced on reclaimed areas and they will be seeded with a <br />USFS approved seed mixture within 7 days following soil material replacement. Slopes that <br />are Tess than 3H:1V shall be dell seeded and steeper slopes shall be broadcast seeded at the <br />USFS recommended application rates. <br />50) MCC will be responsible for controlling and eradicating noxious weed infestations on all <br />project disturbance areas from the date of discovery up to the point of release of the CDMG <br />reclamation bond and associated reclamation liability (approximately 10 yeazs after final <br />reclamation). Any herbicides used must be EPA and USFS approved and will be applied at <br />the recommended rates. <br />51) To discourage access and use of reclaimed areas, natural bazriers and signs will be placed neaz <br />the point where project roads that have been obliterated or converted to ATV trails intersect <br />roads that aze open to public access. Barrier locations and techniques will be identified by <br />the USFS officer. <br />52) Disposal of sewage and trash will be at an authorized disposal site off the Forest. Portable <br />toilets must be provided for personnel working on the drill sites. If more than one crew is <br />utilized during drilling activities, portable toilets will be provided for each crew. <br />53) MCC and/or their contractors must have the necessary materials on hand and immediately <br />available to contain any spills of fuels, oil, and other contaminants. Any spills must be <br />repotted to the USFS immediately. Immediate containment and clean-up will be required <br />consistent with MCC's Spill Prevention, Control, and Countermeasures (SPCC) Plan. Any <br />contaminated soil will be removed from the Forest. <br />54) Approved spazk arrestors will be required and shall be maintained on all internal combustion <br />equipment used on the project <br />2.4.8 Conditions of Approval for Exceptions to Lease Stipulations <br />Specific conditions of approval would be applied where an exception to a lease stipulation is granted, <br />These speufic conditions include applicable provisions identified in the lease stipulations, as well as <br />additional provisions designed to reduce or mitigate potential environmental impacts associated with <br />the excepted activities: <br />Steep Slope. Moderate Sloe. and Geologic Hazard Stipulations <br />55) Special design, construction, and mitigation measures jointly developed by a USFS <br />Interdisciplinary Team and MCC will be applied to project construction activities proposed in <br />steep slope, moderate slope, or geologic hazard aeeas to minimi>e and control the potential <br />for slope de-stabilization and erosion. These meastres may include but will not be limited to <br />site-specific drainage measures, limitations on slope cut/fill angles, slope construction <br />meastres (benching or slope reinforcement such as temporary gabions or bamcades), and <br />slope stabilization measures (geotextile or jute matting or hydromulching). <br />I wumirmm.`ra/Ea/u~Fri~ia~er rurr <br />rrno:,w <br />E nvimnmentalAnerrment <br />
The URL can be used to link to this page
Your browser does not support the video tag.