Laserfiche WebLink
<br />~nks and Gesso, LLC <br />TABLE L <br />RECLAMATION COST ESTIMATE <br />Item Quantity Unit Price Cost <br />Backfill 3:1 pond slope 450,000 $0.40/ CY $ 180,000 <br />Dewater pit (volume below water table) 1,000 $35/ ac-ft $ 35,000 <br />Excavate shale material (Area B liner) 20,000 $0.15/ CY $ 3,000 <br />Backfill to grade (Area A) 360,000 $0.50/ CY $ 180,000 <br />Topsoil application 14,500 $0.40/ CY $ 5,800 <br />Final Grading/Contouring 30.2 $100/ AC $ 3,020E <br />Grass seeding/mulching/fertilizing 18.3 $250/ AC $ 4,575 <br />Slurry Wall installation (Area C) 118,400 $3.00/ SF $ 355,200 <br />DIRECT COSTS $ 766,595 <br />Overhead and profit (14.6%) $ 111,923 <br />CONTRACT AMOUNT $ 878,518 <br />Project Management (9.25%) $ 81,263 <br />TOTAL COST (See' below) $ 959,781 <br />Notes: 1.) Unit prices are based on recent DMG estimates for similar operations. <br />2.) 18-inch liner thickness is assumed in this cost estimate; this figure may be <br />adjusted by subsequent detailed design. <br />The Exhibit L cost estimate represents the full cost of reclamation for <br />developed water storage. As described in Exhibit E of this document, the <br />Applicant will provide the Division of Minerals and Geology plans <br />sufficient for bonding at 20 percent of the reclamation costs shown above. <br />~Q / <br />X <br />~~ / <br />~© v <br />~Uy~ <br /> <br />Lohmann Sand and Gravel Mine.DMG.112 20055 <br />L G. Everisl, Inc March 2001 <br />24 <br />