Laserfiche WebLink
• '.Jestern laving Construction Company <br />Resource and Reclamation Plan <br />R7SOUP.CE DA^1A <br />- Soils: <br />The soils on the site include sort Collins loan, 0 to <br />3 percent slopes; Schamber-3azor complex, 8 to j0 percent <br />slopes; and Stoneham sandy loam, 3 to 8 percent slopes. <br />- Vegetation: <br />The rangeland is in poor condition with the present vegeta- <br />tion consisting of brae grana, ring mutely, three awn, sleepy <br />grass, cholla, yucca, prickly pear, bush buciaaheat, rabbit- <br />brush, and various annual weeds. <br />- Erosion Control practices During '•Iining Operations: <br />Diversions should be used to direct water away from mining <br />area to voints far sofa oisoosal. Debris basins should be <br />. installed to trap sediment and trash, preventing then from <br />moving offsite. <br />P.CLAI-~.TIO?d ~0?•H•L3ID~1TI0?iS <br />-- Constr~.tction: <br />The relaimed area would not have slopes steeper then 3:1. <br />Siooes of o:i or flatter are mach morn dasireable. In <br />general, the chances o° vegetatior. establishmant increase <br />as the percent slope decreases. Small areas steeper than <br />3:1 ors often unavoidable but should be :cent to a_inim~m. <br />Some tyre of jute netting or agronomy blanket should be used <br />to protect and knee soil in place on areas steeper than 3:i. <br />c~rcess water from ad,7acent areas sho ild not be allocaed to <br />flow into the area. Length of s.'.one should be c:,ntrol-ed <br />uith :_iversiors or terrac~~G. <br /> <br />