Laserfiche WebLink
• <br />• <br />1r ~J <br />u <br />Action Taken <br />Replaced topsoil and upper three feet <br />of final graded spoil will be sampled, <br />tested and evaluated. <br />Soil amendments will be added when <br />indicated by the results of soil tests <br />Rill and gully monitoring and repair, <br />maintenance, and normal husbandry <br />activities. Revegetation monitoring. <br />Revegetation success evaluations <br />based on criteria and parameters <br />presented in Tab 22 <br />Phase III bond release is ready for <br />implementation <br />Cessation of Operations <br />Time Period <br />Years 3, 4, or 5 after permanent seeding <br />Years 1 through 8 after permanent <br />seeding <br />Years 9 and 10 after permanent seeding <br />After all disturbed areas have been <br />observed for a minimum of ten years <br />In the event a cessation of mining and reclamation operations is to occur far a period of 30 days or <br />more, or as soon as it is known that a temporary cessation will extend beyond 30 days, the Division <br />will be notified. Within 90 days after notification, a notice of intention to cease temporarily or <br />abandon operations will be submitted to the Division, defining the information required in Section <br />4.30.1 and 4.30.2 as applicable. The cessation plan will be developed in consultation with the <br />Division. <br />TR-25 <br />9 <br />Revised 09/04 <br />