Laserfiche WebLink
RECLAMATION SCHEDULING <br />Action Taken <br />Bonds procured <br />Time Period <br />Prior to mine disturbance <br />Sediment Control <br />Topsoil removed and stored <br />Rough grading <br />Final grading (Phase I bond release <br />is ready for implementation) <br />Spoil sampling <br />Postmine Channel Construction <br />Areas which are severely compacted <br />will be ripped on the contour, and <br />topsoil replaced from stockpiles <br />or direct hauled <br />Topsoil sampling to verify <br />replacement depths <br />Area is drill seeded with the <br />appropriate perennial seed mix, <br />is seeded, shrubs or trees are <br />planted as spring or fall dormant plantings <br />(Phase II bond release is ready for implementationl. <br />A small grain cover crop is applied <br />at a rate of 20 (drilled) or 40 <br />(broadcastllbs/acre <br />Prior to mine disturbance <br />Prior to mining excavation <br />Prior to creating 4 spoil ridges or less than <br />180 days unless approved by variance (see <br />Exhibit 19-iAI <br />Per schedule shown on Exhibit 19-1 <br />After final grading is completed and <br />prior to soil replacement <br />Permanent channel construction including <br />riprap installation will be completed within <br />one year of completion of the final grading <br />of adjacent backfill slopes, and prior to <br />topsoiling of area adjacent to the channel. <br />Within one year after final grading is <br />completed, provided the area is not <br />for facil'nies as described in the <br />Projected 6ackfilling and Grading Schedule <br />section <br />After an area has been topsoiled and <br />prior to any seeding of reclaimed areas <br />First appropriate planting season <br />after topsoil is replaced <br />\J <br />• <br />• <br />TR-25 8 Revised 09/04 <br />