Laserfiche WebLink
COLOWYO COAL COMPANY TABLE 6 <br />RECLAMATION BOND CALCULATION <br />SUMMARY OF COSTS SECTION 16 PIT <br /> Loose Bank Equip Cost Total <br /> Yards Yards Hours per Hour Cost <br />Reclamation Requirements (Lcy) (Bcy) (hours) ($/hr.) ($) <br />Contractor Overhead. Profit and Administrative <br />Public Liability Insurance $25,693 <br />Performance Bontl $17,405 <br />Job Supervision $4.128 <br />Mobilization and Demobilization $5,452 <br />Contractor Profit $165,760 <br />Subtotal Contractor Indirect Costs <br />Prged Administration Costs <br />CMLRD Administrative Costs <br />Contrail Preperation Fees <br />Subtotal Administrative Indirect Costs <br />Subtotal All Reclamation Bontling Costs <br />Phase II and Phase III Bonding Release <br />TOTAL SECTION 16 RECLAMATION BOND <br />$218,438 <br />$2,757 <br />$46,901 <br />$49,656 <br />$1,925,698 <br />$0 <br />$1,925,698 <br />Revision: TR-56 <br />Date: 3/31 /04 <br />fiOND_CALC_TR_56_033109.xis 23a <br />