Laserfiche WebLink
COLOWYO COAL COMPANY TABLE G <br />RECLAMATION BOND CALCULATION <br />SUMMARY OF COSTS SECTION i6 PIT <br /> Loose Bank Equip Cost Total <br /> Yards Yards Hours per Hour Cost <br />Reclamation Recuirements (LCy) (Bcy) (hours) ($/hr.) ($) <br />Earthwork <br />D10N Dozers 3,085,000 2,636,752 5,811 $165.80 $963,424 <br />14G Motorgrader 0 0 0.0 $70.38 $0 <br />5000 Gallon Water Truck 0 0 0.0 $57.90 $0 <br />OveWurtlen Drills 0 0 0 $154.86 $0 <br />Downhole Service 0 0 0.0 $0.14 $0 <br />Total Earthwork Costs 3,085,000 2,636,752 5811 $963,424 <br />Topsoil Distribution <br />777C Haul Trucks 134,992 117,384 605 $187.51 $113,508 <br />992C Loader 134,992 117,384 161 $195.27 $31,493 <br />D10N Dozers 0 0 181 $165.80 $30,083 <br />627E Scraper 291,654 253,612 1,188 $202.16 $240,101 <br />14G Motorgrader 0 0 146 $70.38 $10,262 <br />5000 Gallon Water Truck 0 0 146 $57.90 $8,442 <br /> <br />Total Topsoil Distribution Costs 426,645 370,996 2,427 $433,889 <br />Topsoil Grading <br />14G Motorgrader 0 0 451 $70.38 $31,751 <br /> <br />Total Topsoil Grading Costs 451 $31,751 <br />Revecetation <br />Section 16 Area Disturbance $224,511 <br />Total Revegelation Costs $224,511 <br />Summary of All Activities <br />777C Haul Trucks 134,992 117,384 605 $187.51 $113,508 <br />992C Loader 134,992 117,384 161 $195.27 $31,493 <br />D10N Dozers 3,085,000 2,636,752 5,992 $165.80 $993,507 <br />627E Scrapers 291,654 253,612 1,188 $202.16 $240,101 <br />14G Motorgrader 0 0 146 $70.38 $42,012 <br />5000 Gallon Water Truck 0 0 146 $57.90 $8,442 <br />Overburden Drills 0 0 0 $154.86 $0 <br />Downhole Service 0 0 0 $0.14 $0 <br />Drill Benching Cost $p <br />Other Support Equipment $4,027 <br />Revegelation $224,511 <br />Ofher CMLRD Stipulated Costs $0 <br />Tofal All Direct Costs 3,511,645 3,007,748 8238.1 $1,657,602 <br />Revision: TR-56 <br />Date: 3/31/04 <br />BOND_CALC_TR 56_033104.a1s 2.3 <br />