Laserfiche WebLink
COLOWYO COAL COMPANY <br />RECLAMATION BOND CALCULATION <br />SUMMARY OF COSTS FACILITIES AREA <br />Reclamafon Requirements <br />Facilities Removal <br />Wilson Pond Area <br />Administrative Area <br />Taylor Creek Area <br />Mine Maintenance Area <br />Gossard Area <br />Mine General Area <br />Total Facilities Removal Costs <br />Earthwork <br />D10N Dozers <br />14G Motorgrader <br />5000 Gallon Water Truck <br />Overburden Drills <br />Downhole Service <br />Total Earthwork Costs <br />Facilities Grddinc and Riooing <br />777C Haul Trucks <br />992D Loader <br />D10N <br />Subtotal Facilities Grading and Ripping <br />Toosoil Distribution <br />777C Haul Trucks <br />992D Loatler <br />D10N Dozers <br />637E Screper <br />14G Motorgrader <br />5000 Gallon Water Truck <br />Tofel Topsoil Distdbution Costs <br />Toosoil Grading <br />14G Motorgrader <br />Total Topsoil Grding Costs <br />Revecetation <br />facilities Area Disturbance <br />Total Revegetation Costs <br />TABLE 5 <br />Loose Bank Equip Cost Total <br />Yards Yards Hours per Hour Cost <br />(Lcy) (Bcy) (hours) ($/hr.) ($) <br /> $2,681 <br /> $56,949 <br /> $2,463 <br /> $666,132 <br /> $390,600 <br /> $225,152 <br /> <br /> $1,343,976 <br />233,308 186,646 422 $165.80 $69,898 <br />0 0 0 $70.38 $0 <br />0 0 0 $57.90 $0 <br />0 0 0 $125.00 $0 <br />0 0 0 $0.14 $0 <br /> <br />233,308 186,646 422 $69,896 <br />12,691 10,153 101 $187.51 $18,905 <br />12,691 10,163 16 $195.27 $3,132 <br />1,038,461 830,788 850 $165.80 $140,993 <br /> <br />1,038,461 830,7fie 967 $163,030 <br />226,212 196,706 1,242 $187. 51 $232,956 <br />226,212 196,706 270 $195. 27 $52,775 <br />0 0 286 $165. 80 $47,356 <br />620,264 539,360 2,280 $202. 16 $460,984 <br />0 0 421 $70. 38 $29,647 <br />0 0 421 $57. 90 $23,683 <br />846,476 736,066 4,921 $847,401 <br />0 0 420 $70.38 $29,572 <br />420 $29,572 <br />$343,496 <br />Revision: TR-56 <br />Date: 3/31104 <br />BOND CALC_TR_56_033104.x15 2~ <br />