Laserfiche WebLink
COLOWYO COAL COMPANY <br />RECLAMATION BOND CALCULATION TABLE 2 <br />SUMMARY OF COSTS <br />Loose Bank Equip Cost Total <br />Yards Yards Hours per Hour Cost <br />Reclamation Reouirements (Lcy) (Bcy) (hours) ($/hr.) ($) <br />Toosoil Grading <br />14G Motorgrader 0 0 2,599 $70.38 $182,946 <br />Total Topsoil Grading Costs 2,599 $182,946 <br />Reveoetation <br />East Area Disturbance $405,854 <br />Facilities Area Disturbance $343,496 <br />West Area Disturbance $337,237 <br />Section 16 Area Disturbance $224,511 <br />Total Revegetation Costs $1,311,098 <br />Summary of All Activities <br />777C Haul Trucks 3,157,602 2,744,858 10,695 $187.51 $2,256,060 <br />992D Loader 3,157,602 2,744,858 3,280 $195.27 $736,832 <br />D10N Dozers 15,760,149 13,400,646 40,639 $165.80 $6,824,435 <br />637E Scrapers 1,396,793 1,209,147 5,177 $202.16 $1,046,632 <br />14G Motorgrader 0 0 6,105 $70.38 $429,670 <br />5000 Gallon Water Truck 0 0 3,506 $57.90 $202,266 <br />Overburden Drills 1,664,620 1,422,752 1,799 $154.86 $278,596 <br />Downhole Service 1,664,620 1,422,752 $0.14 $200,608 <br />Facilities Removal $1,343,976 <br />Drill Benching Cost $27,251 <br />Stockpile Waste Removal Costs $51,694 <br />Other Support Equipment $104,826 <br />Revegetation $1,311,096 <br />Subtotal All Direct Costs 21,979,163 18,777,403 71,201 $14,813,942 <br />Miscellaneous Costs <br />Pond Maintenance $20,000 <br />Borehole Sealing Work $14,040 <br />Other CMLRD Stipulatetl Costs $95,109 <br />50% Reseeding for Failure $667,195 <br />Total Miscellaneous Costs <br />Total All Direct Costs <br />$796,344 <br />$15,610,286 <br />Revision: TR-56 <br />Date: 3/31/04 <br />eOND_CALC_TR 66_033104 xis 15 <br />