Laserfiche WebLink
COLOWYO COAL COMPANY <br />RECLAMATION BOND CALCULATION <br />SUMMARY OF COSTS <br />Reclamation Recuirements <br />Facilities Removal <br />Wilson Pond Area <br />Administrative Area <br />Taylor Creek Area <br />Mine Maintenance Area <br />Gossard Area <br />Mine General Area <br />Total Facilities Removal Costs <br />Earthwork <br />637E Scrapers <br />D10N Dozers <br />14G Motorgrader <br />5000 Gallon Water Truck <br />Overburden Drills <br />Downhole Service <br />Total Earthwork Costs <br />Facilities Gradinc and Riooin <br />TABLE 2 <br />Loose Bank Equip Cost Total <br />Yards Yards Hours per Hour Cost <br />(Lcy) (Bcy) (hours) ($/hr.) ($) <br />$2,681 <br />$56,949 <br />$2,463 <br />$666,132 <br />$390,600 <br />$225,152 <br />$1,343,976 <br />367,000 313,675 1,188 $202.16 $240,106 <br />14,721,688 12,569,877 36,210 $165.80 $6,003,664 <br />0 0 148 $70.38 $10,448.81 <br />0 0 148 $57.90 $8,596.00 <br />1,664,620 1,422,752 1,799 $154.86 $278,596 <br />1,664,620 1,422,752 0 $0.14 $200,606 <br />16,753,308 14,306,304 39,494 $6,742,019 <br />777C Haul Trucks 12,691 10,153 101 $187.51 $18,905 <br />992D Loader 12,691 10,153 16 $195.27 $3,132 <br />D10N 1,038,461 830,768 850 $165.80 $140,993 <br /> <br />Subtotal Facilities Grading and Ripping 1,038,461 830,768 967 $163,030 <br />Topsoil Distribution <br />777C Haul Trucks <br />992D Loader <br />D10N Dozers <br />637E Scraper <br />14G Motorgrader <br />5000 Gallon Water Truck <br />3,144,911 2,734,705 10,594 $187.51 $2,237,155 <br />3,144,911 2,734,705 3,264 $195.27 $733,700 <br />0 0 3,579 $165.80 $679,777 <br />1,029,793 895,472 3,990 $202.16 $806,526 <br />0 0 3,357 $70.38 $238,274 <br />0 0 3,357 $57.90 $193,670 <br />Total Topsoil Distribution Costs <br />4,174,704 3,630,177 28,141 $4,887,103 <br />Revision: TR-56 <br />Date: 3/31/04 <br />BONO_CALC_TR_66_033104.z1s 14 <br />