costs for reclamation of the West Pit mine disturbance area only, including direct costs of <br />$4,226,740 and indirect costs of $771,559. <br />Table 4, Summary of Costs -East Pit, shows a complete breakdown of direct and indirect <br />costs for the reclamation of the entire East Pit mine disturbance area only, including direct costs <br />of $6,049,928 and indirect Costs of $1,077,510. In addition, $221,363 is included for Phase II <br />and Phase III Bond Release. <br />Table 5, Summary of Costs -Facilities, shows a complete breakdown of direct and indirect <br />costs for the reclamation of the entire Facilities disturbance azea only, including direct costs of <br />$2,879,671 and indirect costs of $548,085. <br />Table 6, Summary of Costs -Section 16, shows a complete breakdown of direct and <br />indirect costs for the reclamation of the entire Section 16 disturbance area only, including direct <br />costs of $1,657,602 and indirect costs of $268,096. <br />18.0 SUMMARY AND CONCLUSIONS <br />Pursuant to applicable regulations promulgated under the Colorado Surface Mining and <br />Reclamation Act, Colowyo has determined total reclamation costs and corresponding bond <br />amounts for reclamation ofmining-related disturbance during the next permit term as follows: <br />• Total All Direct Costs $15,610,286 <br />• Subtotal Contractor Indirect Costs $ 2,249,610 <br />Subtotal Administrative Indirect Costs -$ 538,397 <br />• Phase II & III Bonding Release - $ 221,363• <br />• TR 49, West Pit Disturbance Area $ 41,085 <br />• TR-53, Section 17 Mining $510,880• <br />Total Sond Amount $19,171,621 <br />These amounts reflect the utilization of the most accurate and current information available to <br />estimate the cost which would be incurred by the MLRD in the unlikely event that Colowyo could <br />not meet the reclamation obligation under the existing approved permit during the next five-year <br />term. The costs for the various tasks associated with the bond reclamation activities are <br />summarized in Tables 2 through 6. <br />Exhibit 13 Bond_Info_033104.doc 11 Revision Date: 3/31/04 <br />Revision No. TR-56 <br />