My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137442
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:05 PM
Creation date
11/26/2007 6:00:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991146
IBM Index Class Name
Permit File
Doc Date
2/26/1992
Doc Name
LIMITED IMPACT OPERATION 110 2 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
While the temporary diversion is being constructed, same <br />water will be allowed to flaw past the diversion in the <br />existing channel at the same time water is directed into the <br />Phase I area. This will allow the Phase I channel to become <br />saturated as water flows northward to where it will re-join the <br />existing channel. The quantity of water in the main channel <br />will be temporarily decreased while this flow is <br />re-established. This will be done in early spring or late fall <br />when flaws are slightly higher than in winter, but not during <br />irrigation season when there is a greater demand by downstream <br />users. <br />To assure that the quality of the groundwater is not <br />adversely affected by the proposed operations, water sampling <br />of the Webb well has been started so that baseline data is <br />available. The Webb well will be routinely Sampled. If the <br />water table rises to where there is water in any of the three <br />monitor wells, samples will also be taken at these locations. <br />5. Please refer to the enclosed Buckhorn Geotech analysis <br />dated February 10, 1992. <br />6. As described in Item 4 above, the proposed diversions <br />will be scheduled at times when the river volume is slightly <br />higher than normal, but at times when demands of irrigation d^ <br />not exist. The month of April has mean flows twice those of <br />the winter months, but is prior to the high flows of May to <br />June and is also before the irrigation season. The months of <br />September and October also have flows higher than in the winter <br />and are also at a time when the irrigation demands are <br />decreasing or have stopped. <br />7. Please refer t^ the enclosed Buckhorn Geotech analysis <br />dated February 10, 1992. <br />8. Please refer to the enclosed Buckhorn Geotech analysis <br />dated February 10, 1992. <br />9. The east boundary of the permit area is in the center <br />of the historic high-water channel as indicated on Exhibit E - <br />Map. Since the boundary of the Phase II excavation has been <br />moved so as not to disturb the mature cottonwood trees along a <br />portion of the boundary, riprap will be placed along the <br />excavation near the trees as indicated on Exhibit E - <br />keclamation Plan Map. A rail/wire structure will be placed <br />along the east boundary, 4rom the southern permit boundary to <br />this riprap for additional erosion control. <br />10. Please refer to E>:hibit E - keclamation Plan Map. <br />11. The present river channel on the north end of the <br />• property is in a direct line with the Phase I excavation and <br />the flow will be directed to this channel as the river is <br />diverted for F'hase II. As discussed at our on-site meeting <br />January 16, 1992, it would be advantageous to keep the flow of <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.