Laserfiche WebLink
'ROJECT ORGANIZATION <br />• Throughout the project, Thomas J. Lennon and Michael S. Burney acted as principal <br />investigators; and Charles LV. LVheeler performed the duties of project manager. William <br />Lane Shields was crew foreman, and Richard Elk and Roger L. Johnson were crew <br />members from October 1 through 5, 1919. Elisa itiade and David Ayers completed the <br />survey on June 13 and 14, 1980. All field personnel participated in all aspects of survey <br />and recording. <br />,111 laboratory analysis, photograph selection, and report preparation and reproduction <br />were performed by C. 1~'heeler, W. L. Shields, and R. Johnson. Dennis Lennon prepared <br />the graphics and Carol Coe edited the drafts of this report. The staff at R'C RM in <br />Boulder assembled the final report. <br />No artifacts were collected. All site forms are on file with the Colorado Preservation <br />Office, Denver, Colorado, and all photographs remain on file with tVCRR4, Boulder, <br />Colorado. <br />• <br />• <br />4 i <br />