Laserfiche WebLink
• LORENCITO COAL COMPANY <br />CDMG PERMIT NO. C-96-084 <br />TECHNICAL REVISION 06 <br />RECLAMATION COST ESTIMATE <br />SEPTEMBER 10. 2001 <br />TASK DESCRIPTION QUANTITY UNITS $/UNIT TOTAL ($) <br />JEFF CANYON HAUL ROAD <br />Reclaim existing road -replaced by new construction to decrease <br />grade -approximately first 1100 ft of existing Jeff Canyon <br />road west of Lorencito Canyon road <br />1. Dozer push approximately 800 ft roadcut (see sketch) 2800 cu yd 1.22 3416 <br />2. Dozer grading of remaining 300 it of road 540 cu yd 1.22 659 <br />3. Rough Grade 50600 sq ft 5622 sq yd 0.16 900 <br />4. Load and haul topsoil approx 1000 ft - 50600sq ft @ .92 ft 1724 cu yd 2.08 3586 <br />5. Spread topsoil 1724 cu yd 1.22 21 D3 <br />6. Fertilize, seed, and mulch 1.2 acres 1655.3 1986 <br />Subtotal 12650 <br />SEDIMENT PONDS 007a, 009, and 009a <br />Reclaim sedimentation ponds, approximately 1 acre each - <br />topsoil and backfill material lasted 100 ft away from each <br />• <br />t .Clean 3 ft of sediment from each- 3acres @ 3 h 14520 cu yd 1.56 22651 <br />2. Final grade - 3acres 14520 sq yd 0.13 1888 <br />3. Spread topsoil @ .92 fl 4453 cu yd 0.84 3741 <br />4. Fertilize, seed, and mulch 3acres 1655.3 4966 <br />Subtotal <br />MOBILIZATION, DEMOBILIZATION <br />D-9 dozer, 992 FEL, 30-T dump truck from Pueblo 3 each <br />TOTAL DIRECT RECLAMATION COSTS <br />CONTRACTOR'S OVERHEAD <br />Public Liability Insurance at 1.55% of TDRC <br />Performance bond at .975 % of TDRC <br />TOTAL CONSTRUCTION CONTRACT AMOUNT <br />CDMG ADMINISTRATION FEES <br />Project engineering at 4% of TCCA <br />Staff Administration at 3.13% of TCCA <br />Job Superintendent at $10000 per month - 1 month <br />• 70TAL PERFORMANCE BOND AMOUNT <br />3-/acz <br />Subtotal <br />Subtotal <br />33245 <br />1160 3480 <br />49375 <br />765 <br />481 <br />1247 <br />50622 <br />2025 <br />1584 <br />10000 <br />13609 <br />64231 <br />-0(0 9~0/ <br />