Laserfiche WebLink
establish. Additional plantings may be installed once the reservoirs <br />are full of water and the grasses are established. <br />c, Fertilization -types, mixtures, quantities, and time of application; <br />The type and application rate of fertilizer shall be determined based <br />on a soil test at the time of final reclamation. <br />d. Revegetation -types of trees, shrubs, etc.; and <br />Please refer to the Reclamation and Landscape Plan Maps for the <br />types, quantities and location of trees and shrubs to be planted. <br />e. Topsoiling -specify anticipated minimum depth or range of <br />depths for those areas where topsoil will be replaced. <br />Topsoil will be uniformly placed and spread on all areas disturbed by <br />the mining above the anticipated high water line. The minimum <br />thickness shall be 6 inches above the surrounding finished grade. <br />Hall-Irwin Corporation -Parker/Dersham Sand and Gravel Mine - MLRB 112 Permit Application <br />Exhibit E - 6 <br />