My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137192
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:51 PM
Creation date
11/26/2007 5:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
Permit File
Doc Date
1/6/2006
Doc Name
New 112c Appl.
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) A plan or schedule indicating how and when reclamation will be <br />implemented. Include: <br />a. An estimate of the periods of time which will be required for the <br />various stages or phases of reclamation. <br />Please refer to the Timetable for Mining and Reclamation in Section <br />(e) of Exhibit D. <br />Reclamation of each Phase will be completed approximately 1 %z - 2 <br />years after mining of a specific phase is complete, but no longer than <br />5 years from the beginning of mining in a Phase. Therefore the final <br />reclamation of the site is anticipated to be completed within 2 years of <br />the completion of mining Phase 3. Please note that the schedule is <br />an estimate based on current market conditions. The timing may vary <br />depending upon the demand for construction material, which may <br />impact the life of the mining operation. <br />b. A description of the size and location of each area to be <br />reclaimed during each phase. <br />Once each phase has been mined reclamation will proceed. <br />c. Outlining the sequence in which each stage or phase of <br />reclamation will be carried out. <br />Please refer to the Timetable for Mining and Reclamation in Section <br />(e) of Exhibit D. <br />2) A description of: <br />a. Final grading -maximum anticipated slope gradient or expected <br />ranges thereof; <br />Phase 1 and 2 on the Parker property will be backfilled to near <br />existing grade, topsoiled, seeded and mulched. The final grade will <br />be sloped at 0.5 - 2 percent consistent with pre-mining conditions. <br />The finished slopes of the reservoir will be 3 horizontal to 1 vertical. <br />b. Seeding -types, mixtures, quantities and time of application; <br />Please refer to the Reclamation Plan Map for the list of plant materials <br />and seeds to be utilized. The operator will seed during the <br />appropriate season to ensure adequate moisture for germination and <br />implement weed controls to allow the grasses to successfully <br />Hall-Irwin Corporation -Parker/Dersham Sand and Gravel Mine - MLRB 112 Permit Application <br />Exhibit E - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.