My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE137129
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE137129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:46 PM
Creation date
11/26/2007 5:35:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENT PONDS
Section_Exhibit Name
TAB 07 APPENDIX 7-6 ATTACHMENT 7-6-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Reg. <br />• Wadge Impoundment (l~002) <br />The Wadge Impoundment was established in 1976, and has a maximum <br />capacity of 303.6 acre-feet at elevation 6612. (see Exhibit 7-7 for loca- <br />tions). <br />Based on the HYMO program, the following peak discharges can be ex- <br />pected: <br />Event <br />Premine <br />10 year-24 hour <br />25 year-24 hour <br />100 year-24 hour <br />Posimining <br />• I 0 year-24 hour <br />25 year-24 hour <br />100 year-24 hour <br />Peak Discharge (cfs) <br />101.1 <br />133.8 <br />190.4 <br />115.9 <br />150.7 <br />210.4 <br />The total drainage area for the Wadge Impoundment is approximately 2382 <br />acres (see Area f~2, Exhibit 7-7). The existing plan view and cross-sections <br />of the impoundment are on Exhibit 7-8 and 7-9. <br />Seneca Coals, Ltd. has concluded that the Wadge Impoundment is of suf- <br />ficient length and cross-sectional area to obtain the necessary detention <br />time required To meet the limitations of state and federal regulations for <br />mine runoff water discharge; therefore, Seneca Coals, Ltd. requests the <br />Wadge Impoundment be accepted as it currently exists without modifica- <br />tion except the addition of one 48 inch diameter, CMP, culvert in addition <br />to the existing 30-inch diameter, CMP, culvert at the discharge end of the <br />Wadge Impoundment under the haul road to handle the 10 year-24 hour and <br />25 year-24 hour precipitation event (Culvert No. 9a and 9b). <br />,~ <br />7-6-2-2 Revised 5/27/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.