My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136843
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:28 PM
Creation date
11/26/2007 5:12:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
Permit File
Doc Date
11/11/1974
From
NORMAN R BLAKE
To
LOVELAND READY MIX CONCRETE INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~J <br />• <br />Land Reclamation Board Page 2 June 27, 1974 <br />We strip the area we are to mine, open the pit with a dragline, <br />pump water out of the pit untill it is relatively dry and excavate <br />with the dragline to full depth of the sand and gravel. Material <br />is then truck hauled to our c~vshing, washing and sizing plant. <br />Most of our production is used by ourself in concrete. We do not <br />discharge either our pit pump water or wash water in the river. <br />These vraters are pumped into prior pits and used for wash water <br />and to maintain our pit levels. Our general plan is to leave a <br />series of lakes in the area. These lakes to have interconnected <br />land masses. The land mass to flu~nish road ways, open areas, camp- <br />ing areas and office area to Fully develop the general area as <br />a camping, hiking, fishing area. <br />2(i-j) A study of our requirements on a projected basis indicates we would <br />work out the area we now own in 25 to 30 years. We have set up <br />the operation in five year phases and drill work about 30 acres <br />every five years. The attached maps show these phases and the area <br />in each phase. These phases will be mined then trees and grass <br />and., shrubs planted on the land masses not used for roads, fish <br />planted in the lakes. The lakes will be connected by pipes to <br />allow maintainence of water level and movement of fresh water. <br />We own sufficient water rights to take care of the lakes. Timing <br />on the above five year phases would be to start reclamation within <br />one year of mining and complete within 2 years of mining in each <br />phase. At total completion of all phases we would plan to look <br />at the requirements of the general area and meet these at that time. <br />This is a general plan which will in all probability change with the years. <br />We therefore apply for a permit only on Phase (1) our first five year plan <br />which covers 30 acres. <br />Enclosed is our check for $500.00, to cover our permit fee. <br />Toro copies of a set of maps are attached showing the requirements of 3(a to 1). <br />Please advise of the amount of the required bond. <br />Very truly yours, <br />LOVELAND Y MIX CONCRETE, INC. <br />George'Fanch <br />Vice Pr s~ ident <br />GAF:ms <br />Enc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.