Laserfiche WebLink
III I II I II I II IIII III Doc Date:12/11/2001 <br />sss <br />• 5\`/ SECTION 1.0 1992 Annual Reclamation Report <br />As specified by the revisions (1/3/90) to 2CCR 407-2, 2.04.13, page 74, Trapper Mine is submitting an <br />Annual Reclamation Report for the previous calendar year (1992). <br />Historically section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be sub- <br />mitted to the CMLRD annually by March 15th. Prior to 1988 the map was entitled the "Postmine Contour <br />Map." As requested the title was changed in 1988 to "Reclamation Map." The recli~mation map was devel- <br />oped from aerial photographs taken during the previous fall showing the pit advancements, recontoured <br />spoil areas for the year and an historical account of the previously regraded areas. <br />The 1992 reclamation map is a composite of the aerial photographs taken in October, 1992, and the recla- <br />mation performed during 1992 for all areas under bond. The map(s) (1.0) show the location and number of <br />acres for the acres disturbed, the aces backfilled and graded, the acres topsoiled and the acres revegetated <br />during 1992. In addition, the location, number of acres and the planting dates for all previously revegetated <br />aaes are provided. <br />1.1 Permittee Identification <br />The permittee for this annual reclamation report is: <br />Trapper Mining Inc. <br />P.O. Box 187 <br />• Craig CO 81626 <br />Permit No. (C~1-010) <br />1.2 Results <br />The 1992 reclamation results are presented in Table 1.1 and map(s) 1.0. The various reclamation stages are <br />addressed below in separate subsections. <br />1.2.1 Disturbed Acres (1992) <br />In 1992, Trapper disturbed 369.2 acres resulting from topsail salvage, haulage corridor construc- <br />tion, topsoil stockpile construction, sediment pond censtruction, and other miscellaneous activities <br />as approved by the Division. <br />1.2.2 Back611ed end Graded Acres (1992) <br />Trapper backfilled and graded to final contour (AOC) approximately 148.7 acres in 1992. These <br />acres were in Ashmore, Browning, Colt and Derringer pits. <br />1.2.3 Topsoiled Acres (1992) <br />Trapper retopsoiled 141.7 acres during 1992 in Ashmore, Browning, Colt, :tnd Derringer pits. <br />1.2.4 Species Planted During 1992 <br />. The species and seeding rates used at Trapper during 1992 were presented and approved in <br />minor revision 116 (4/8/92). The mixes were seeded as approved. See 'Cable 1.1 and maps 1.0. <br />There were 141.7 acres revegetated to perennial species associated with mine pit(s) advancement <br />