My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136653
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:17 PM
Creation date
11/26/2007 4:58:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 13 DRAINAGE AND SEDIMENT CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-1 <br />LJ <br />C~ <br />• <br />included in the appendix to this exhibit, A brief description of the design <br />of each ditch is-provided below. <br />Diversion Ditch No. 1 <br />Drainage down Coal Gulch will be diverted around the disturbance area with the <br />construction of Diversion Ditch No. 1. Peerless will upgrade Ditch No. 1 to <br />ensure adequate flow capacity and minimize impacts to surface water flows in <br />Coal Gulch. As part of the Reclamation Plan, Peerless plans to leave the <br />upper part of Ditch No. 1 as a permanent structure. The lower part will be <br />relocated as shown on the Post-mining Topography Map, Map 14. Design <br />calculations for Ditch No. 1 are included in the appendix to this exhibit. <br />Ditch No. 1 has been observed to contribute seepage onto the upper mine bench <br />area where the undisturbed Coal Gulch channel enters the upper section of <br />Ditch No. 1. To control this seepage, a bentonite (clay) dike was constructed <br />along the upper 700 foot section of Ditch No. 1. This dike was built by <br />excavating a trench down to bedrock with a backhoe and filling the trench with <br />bentonite. The dike was also keyed into bedrock at the opposite (north) side <br />of the channel at the head of the ditch. In this manner a barrier to flow was <br />constructed to prevent water from flowing onto the mine bench. <br />Diversion Ditch No. 2' <br />Ditch No. 2 is located east of the disturbed area along an existing road, <br />Flows from this ditch discharge to an existing drainage and the south side of <br />Revised 9/12/86 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.