Laserfiche WebLink
~- - <br />-3- <br />(d) indicate the direction that mineral extraction will proceed; <br />(e) note the location of any significant, valuable, and permanent man-made structures <br />within two hundred (200) feet of the affected area such as houses, barns, fences, above or below <br />ground utilities, irrigation ditches, maintained or public roads, bridges, wells, pipelines, water storage <br />impoundments, railroad tracks, cemeteries, and communication antennas. A narrative description must <br />be provided in Exhibit B -Site Description; and <br />(f) outline and label existing disturbance within and/or adjacent to the permit boundary <br />(e.g., previously mined areas, roads or excavations resulting from utility construction). Re-disturbance <br />of previously disturbed areas, by the proposed mining operation, must be included in the permit area <br />and addressed in Exhibit D -Reclamation Plan. <br />(3) Reclamation Plan Ma <br />(a) show the gradient of all reclaimed slopes (horizontal:vertical) sufficient to describe the <br />post mine topography; <br />(b) indicate where vegetation will not be established and the general area(s) for shrub or <br />tree planting; <br />(c) if ponds are a part of the Reclamation Plan, outline [he final shore configuration of the <br />ponds and shallow areas if the future land use is for wildlife; <br />(d) state the average thickness of replaced overburden by reclamation area or phase; and <br />(e) state the average thickness of replaced topsoil by reclamation area or phase. <br />Your application will not be considered filed until the information listed above is received and found sufficient <br />to begin our review. A decision date will be established 30 days from the date of receipt of all of the requested <br />information. Additionally, if you have already published notice you will need [o republish notice, after the <br />Division considers the application submitted. Republication must occur once within ten (l0) days of the <br />submittal date. We will notify you when you should initiate republication of your notice. The final date for <br />receiving comments is ten (l0) days after the date of publication or the next regular business day. <br />This letter shall not be construed to mean that there are no other technical deficiencies in your application. The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Act <br />after submittal of all required items. <br />Sincerely, <br />~~ C~- <br />Suzi Eridtcsen <br />Program Assistant <br />