Laserfiche WebLink
Geotecttnical Investigation <br />• The surface upon which the exploration activities will occur is owned by Cyprus <br />Western Ooat Ooag,~any. Twentymile has the legal riot to enter the property to <br />corduc-t its explcrcatia~n activities. <br />Site Description -Sites 1 and 5 are located within an area that has been <br />disturbed previously by CYOC's surface minim activities. It should be noted <br />that site 1 is located within a bowl release area. Sites 2 thrax~i 4 are located <br />on undisturbed areas adjacent to the above referenced surface mine. In reference <br />to Sites 1 and 5, topsoil was salvaged prior to mining the area and then <br />reapplied during the reclamation. In reference to sites 2 through 4, <br />apprr+Yi~tely 12 to 18 inches of soil exists within the area. <br />The reclaimed area has been seeded to a pastureland mixture, while the <br />undisturbed area can be characterized as rangeland dominated by sagebrush. Any <br />areas disturbed during the site investigation will be reclaimed and seeded with <br />CYOC's approved pastureland seed mixture. <br />• The site investigation area is located within the Foidel GYeek drainage. Given <br />the fact that all surface runoff drains to Pond D, no impacts are anticipated far <br />Foidel GYeek. The borings will be into spoil and adjacent bedrock, and except <br />for arty of the borings that may be wnverted to monitoring wells, the borisgs <br />will be grouted or backfilled upon cwtq~letion of the irnestigation. No impacts <br />are anticipated to the Wadge Overbuzdert aquifer. <br />The site investigation will minimize disturbance by conducting the field <br />activities during periods of favorable weather and field conditions. Therefore, <br />unless adverse field or weather oortditions are encountered, topsoil will not be <br />salvaged from access ranter into the boring or test pit sites. If an area needs <br />to be leveled to aoco4mtodate the auger or backhoe the available topsoil will be <br />salvaged aryl placed adjacent to the site. The auger site will be a~rx *-~+yi~++~tely <br />30' x 30' , and for sites located on reclaimed areas this would rec~,i re salvaging <br />arnrr~Yimately 33 CY of topsoil per site. Sites located on the adjacent <br />undisturbed area would require salvaging approx;mately 83 CY of topsoil per site. <br />Upon ooaq~letion of the activities the topsoil will be redistributed over the <br />. site. For sites that will ~,;~ minor leveling the material will be retained <br />within the pad and the pad regraded to blend in with the surrourdirg topography <br />upon oa~q~letion of the boring. <br />MR 92-75 780-38 (e) Revised 05/08/92 <br />