on Permit Renewal Map 5. The area to be disturbed is approximately 12 acres <br />• in size, and topsoil will be salvaged from the site prior to placing any <br />coal in the area. The topsoil can be salvaged to an approximate depth of 24 <br />inches in this area. Therefore, approximately 38,700 CY of topsoil will be <br />picked up and placed in the two stockpiles adjacent to the area. The <br />stockpile will be stabilized with the approved topsoil seed mixture. <br />The existing sediment control system will be utilized to control runoff form <br />the site. presently, drainage from this area drains into ponds B and D, and <br />will continue to do so after the storage pad is completed. A segment of <br />Ditch B-1 will be filled in and replaced by a "temporary" ditch that will <br />move up the hillside as the pile expands. The "temporary" ditch will be <br />constructed to the same specifications as the original ditch. <br />The original B-1 ditch will be backfilled with earthen material, or it may <br />be backfilled with gravel and a drain pipe. If this drain were constructed <br />it would drain into the remaining section of ditch B-1. <br />• The storage pad will require minor levelling to make if functional. This <br />typically would involve the use of a blade or dozer to level the pad, and <br />upon reclamation this levelling would typically occur on the side slopes, <br />and these slopes would be reestablished during reclamation of the site. The <br />final reclamation will inc•l.ude g d l?g, ,topsoil redistribution,7and seeding <br />the area. ~ ~ ~J ----_-. ___,/ <br />- - ___~ <br />Along with construction of the storage pad, a ramp will be constructed on <br />the north side of the existing truck dump to provide greater access to the <br />truck dump. Approximately 1500 CY of fill material will be required to <br />construct the ramp. This material will be borrowed from the adjacent <br />disturbed area or hauled down from Area 61. When the ramp is reclaimed the <br />1__ - - <br />ramp fill material will be-graded out and blended in with the surrounding <br />area. <br />---`_ <br />The storage area and ramp will be reclaimed when the tipple facility is no <br />longer required for processing run of mine coal. The area will be returned <br />• to rangeland and planted with the appropriate seed mixture. <br />MR 90-48 780-35(b) Revised 04/12/90 <br />