Laserfiche WebLink
Agency ar organization name :DMG <br />Permit or other job action :New 112 <br />Task descdp8on :Rip Processing Area <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Basic machine :Cat O8R Series ll - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Altemate methods - <br />Selsmic : NA NA load factor <br />acres <br />Rip depth (ft) <br />Area : 31.00 <br />Selected estimating method : Area <br />NA Bank volume : NA BCY <br />2.00 Volume : 100,027 BCY or CCY <br />Source of estimated quantity :OMG Estimate <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Altemate methods - <br />Selsmic : Seismic velocity : NA feef/second <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method : 1,870.99 cu. yds./hour <br />Area : Avg. ripping depth : 1.50 feef/pass Site altitude : 4,950 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HBJ <br />Average ripping length : 200.00 feeUpass Jab efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.773 acres/haur Adjusted unit production : 1,552.92 cu. yds./hour <br />Unadjusted production : 1,870.99 cu. yds./hour Adjusted fleet production : 1,552.92 cu. yds./haur <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 84.41 hours <br />Unit cost : $0.109 per cu. yd. Total job cost : 510,932 <br /> <br />