My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136299
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:59 PM
Creation date
11/26/2007 4:28:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005066
IBM Index Class Name
Permit File
Doc Date
5/31/2006
Doc Name
112c Decision Ltr - Financial & Performance Warranty Request
From
DMG esc
To
Asphalt Paving Company
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 00$ State :Colorado PermiUjob# : M-2005-066 <br />Date : 05/30!2006 County :Weld Abbreviation :none <br />User: ESC Site:WattenbergWest Filename:M088-003 <br />Agency or organization name : DMG <br />Permit or other job action :New 112 Permft <br />Task description :Replace Top <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />on slopes above waterline <br />Basic machine :Cat D8R Series ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization °h <br />Ownership cosUhour : $53.92 NA <br />Operating cosUhour : $75.29 100 <br />Ripperap.cosUhour: $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cost/hour : $161.74 Total fleet costlhour <br />volume: 4,000 CCY <br />Swell Loose <br />factor : 1.115 volume : 4,460 LCY <br />74 <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCYlhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 4,950 feet <br />Material weight : 2,100 Ibs/LCY <br />Weight description <br />EaRh -Loam <br />JOB TIME AND COST <br />Operator skill : 0.75 (ae <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (1shi1 <br />Spoil pile : 0.80 (fnc <br />Push gradient : 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 1.10 (Cat <br />Blade type : 1.00 (S/SI <br />Net cartection : 0.55 <br />Adjusted unit production : 205.99 LCYIhr <br />Adjusted fleet production : 205.99 LCY/hr <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Fleet size : 1 Dozers) Total job time : 21.65 Hours <br />Unit cost : $0.785 /LCY Total job cost : $3,502 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.