My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136299
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:59 PM
Creation date
11/26/2007 4:28:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005066
IBM Index Class Name
Permit File
Doc Date
5/31/2006
Doc Name
112c Decision Ltr - Financial & Performance Warranty Request
From
DMG esc
To
Asphalt Paving Company
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />sheet 2 of 2 <br />Haullna Caoaclri <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Earth -Loam <br />Rated payload : 48,000 pounds <br />Payload capacity : 22.86 LCY <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />hourly production reBecis volume per scraper pair an push~pull models <br />Cvcle Tlme : ob Condltlon C orrections : Site altitude (ft.) : 4,950 <br /> Scraper Push dozer Source <br />Scraper loading time ` : 1.50 minutes Altitude adj.: 1.000 NA (Cat HBJ <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />• load time per scraper pair on push-pull models Net COReCtIOn : 0.830 NA <br />Travel time <br />Road condition descdption :Rutted dirt, IitBe maintenance, no water, 2"tire penetra8on <br />Haul Route <br />Seg. # Haul distance (feet) Grade (°~) Roll. res. (°~) Total res. (°~) Velocity (fpm) Travel time (min.)" <br />1 1,000 0.00 5.00 5.00 2218 0.60 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Return route 0.80 minutes <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />•• travel tlme for each segment is adjusted for accehrration/deceleretion. Return time : <br />table velodties are max. adainable per total resistance dawn, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : <br />Unadjusted unit production/hour : 318.69 LCY/hour "' Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) houdy production : <br />Adjusted multiple scraper team (fleet) houdy production : <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job 8me : <br />Unit cost : 51.105 /LCY Total job cost : 0.50 <br /> <br />3.20 <br />264.51 <br />2 <br />529.03 <br />529.03 <br /> <br />34.14 <br />519,959 minUteS <br /> <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br /> <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.