Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :OMG <br />007 state :Colorado PenniUjob # : M-2tN15-086 <br />05l30lZ006 Ccunty :Weld Abbreviation :none <br />ESC Site : Wittenberg West .Filename :M066007 <br />Permit or other job action :New 112 Pemtif <br />Task description :Replace Topsoil in areas stopped /n advance of mining <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bn <br />Scraper work team -Scraper :Cat 827G <br />-Push dozer:NA <br />Support equipment-Load area :NA <br />-Dump area :Cat D8R Series II - 8SU <br />Road maintenance -Motor grader :~NA <br />-Water Wck :NA <br />akdown : Screper Work Team <br />Screper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA dozer NA NA <br />°h Utilization-machine . 100 NA NA 100 NA NA <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownerhip cosUhour : 546.97 NA NA $53.92 NA NA <br />Operafingcosf/hour: $131.73 NA NA $75.29 NA NA <br />Ripperap.cosUhour: NA NA NA $0.00 NA NA <br />Operator cosUhour. $32.72 NA NA $32.53 NA NA <br />Unit subtotals : $211.41 NA NA $181.74 NA NA <br />Number of units : 2 0 0 1 0 0 <br />Group subtotals : Work : $422.82 SuppoR : $161.74 Maintenance : $0.00 <br />Total work team cosUhour : 6584.57 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 18,200 CCY factor : 1.115 volume : 18,083 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />