Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (H): <br />____________ <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />_____I_______________________________~......___________I_________~ <br />Subtotal (I): <br />____________ <br />J. EARTHWORK - TOVSOI L/SUBSOIL REPLACEMENT <br />Task No.~ Task Destription ~ Cost (f) <br />___...._I__________________________________________________I________~__ <br />1 ~ Strip Topsoil from Urmined Area ~ 5116,749 <br />4 ~ Replace Topsoil over 792 acres ~ f80,970 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (J): f797, 779 <br />