My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136211
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:53 PM
Creation date
11/26/2007 4:20:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER G APPENDIX H NORTHERN COAL CO RIENAU 2 MINE NORTHERN 1 MINE AND WILSON LOUDY LOADOUT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. The applicant has provided potentiometric surface maps for J, G, and P <br />seam zones on Exhibits 9-14, 15, and 18 respectively. The applicant shall <br />include the static water level data used to prepare these maps and any more <br />recently completed water level data. <br />Response: Please see response 2.04.7(1) ground water information of the <br />June 25, 1981 letter in this submission. <br />10. The applicant shall provide data and results of their study monitoring <br />the crossing of G coal seam under Curtis Creek. This information should <br />include,at a minimum, water levels in bedrock, alluvial and coal seam wells, <br />surface water monitoring data on the creek, flow meter data or inflow along <br />the G-seam face and all subsidence monitoring data. Any additional pertinent <br />data and analysis shall also be provided. <br />Response: Northern has provided as much of this data as has been obtainable <br />in the form of quarterly monitoring reports to the CMLR staff. <br />11. Ia Chapter G, page 6-8, the applicant describes the sampling program <br />implemented in the spring of 1979 for surface and ground water in the total <br />leased area. Table G-8 lists "full suite" water quality parameters to be <br />analyzed quarterly and page 6-13 lists "short list" constituents to be <br />sampled monthly. The applicant shall indicate which ground water and surface <br />water stations are to be analyzed throughout the mining and post-mining <br />period. For surface monitoring, the applicant shall include flow measurement <br />recorded at the time of sample collection. These measurements shall be <br />included on the water quality analysis sheets. <br />Response: Please reference the March 31, 1982 letter attached in ~ibit G-11 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.