Laserfiche WebLink
• <br />The topsoil from area A wi21 be spread over the sand~3tone <br />at a depth of 6" to 12". Seeding will be done with e~ <br />mixture of Indian ricegrase and Annual rye <br />Phase IV Area 7 will be stripped. The topsoil will be removed, <br />stockpiled, preserved and vegetated in Area A. The <br />sandstone overburden will be stripped and st.ockpilecl <br />in front of area A. Limestone will be removed from <br />Area 5, 6 and the remaining limestone in area 10. TFiis <br />phase is expected to require 4 years. The total area <br />• <br />worked is expected to be 32 acres. <br />Phase V Limestone will be removed from areas 7 and 8. This i.s <br />expected to require 2 years. The total area worked s:t <br />this time is expected to be 16 acres. <br />Phase VI Reclamation will be completed during this phase. The. <br />sandstone overburden will be pushed back into the <br />excavation left by the limestone leveled and contoured <br />to a slope of less than 2 to 1. The topsoil will be <br />_-~ <br />~ 1 <br />leveled over the sandstone to a depth ofd 8" to 12". <br />The area will be seeded with a mixture of Indian rice:grass <br />Wheat grass, Mountain mahogany and Rabbit brush, to lie <br />hand broadcast at 18 lbs per acre, in the spring. Ttiia <br />will be accomplished within S years of completion of <br />mining. <br /> <br />r~ <br />L_J <br />