Laserfiche WebLink
phase III of the mining p0.an. <br />Year Nine thru Twelve <br />Topsoil will be removed from the lower sections of Areas 7. <br />This topsoil will be segregated and stockpiled in Area A. <br />Annual rye and Indian ricegrasa will be used to vegetate <br />.' <br />and preserve the topsoil. This will be done during phase <br />of the mining plan. <br />Year Thirteen thru Fourteen <br />No reclamation is expected to occurr during phase V of the <br />mining plan. <br />Year Fifteen thru Seventeen <br />Reclamation will be completed during this phase, The sand- <br />stone overburden will be backfilled into the excavation areas. <br />The sandstone will then be leveled and contoured to a slope of <br />. 2 to 1 or leas following the North East eloping terrain. The <br />topsoil will be leveled over the sandstone to a depth of 6" <br />to 12". This will cover approximately the same area which <br />originally had topsoil cover. The area will be seeded with. a <br />mixture of Indian ricegrass, Wheat grass, Mountain mahogan}~ <br />and Rabbit brush. This will be hand broadcast in the aprii:g <br />at 18 lbs per acre. Area reclaimed will be approximately '0 <br />scree. Total reclamation will be accomplished within 5 years <br />upon completion of mining activity. <br /> <br />i <br />e <br />I <br />