Laserfiche WebLink
~~ <br /> <br />RECLAMATION TIME TABLE <br />Year One thru Two <br /> <br />Topsoil will be removed from the lower section of Areas 1, 2, <br />and 9. This topsoil will be segregated, and stockpiled in <br />Area A. Annual rye and Indian Ricegrass will be used to <br />vegetate and preserve the topsoil. Topsoil from Area C will <br />be removed to a depth of 6" to 14" and will be segregated, <br />stockpiled and vegetated with Annual rye and Indian ricegrass. <br />This will be done in phase I of the mining plan. <br />Year Three thru Five <br />• <br /> <br /> <br />Topsoil will be removed from the lower section of areas 3, 4 <br />and 8. This topsoil will be segregated and stockpiled in Area A. <br />Annual rye and Indian ricegrass will be used to vegetate and <br />preserve the topsoil. This will be done in phase II of the <br />mining plan. <br />Year Six thru Eight <br />Topsoil will be removed from the lower section of Areas 5 and 6. <br />This topsoil will be segregated and stockpiled in Area A. Annual <br />rye and Indian ricegrass will be used to vegetate and preserve <br />the topsoil. Area 9 will be reclaimed. The sandstone overburden <br />will be backfilled into the excavation left by extraction of the <br />of the limestone and leveled and contoured to a 91ope of 2 to 1 or <br />less following the North East sloping terrain. Topsoil from Area <br />A will be spread over the sandstone overburden at a depth of 6" or <br />12". Seeding will be done with a mixture of Indian ricegrass, Wheat <br />grass, Mountain mahogany and Rabbit brush which will be hand broad- <br />cast in the spring at 18 lbe per acres. The reclaimed a.uring this <br />phase will be approximately 3 acres. This work is to bE: done during <br />