Laserfiche WebLink
<br /> <br /> <br />programs established, The circumstances for each study may vary <br />requiring the shifting of emphasis and level of data gatheri.na, <br />to meet cliangi.n, conditions, Time constraints permitting, the <br />baseline work should be conducted over an annual high-low flow <br />period and complete vegetative r,ycle, Both tlae baseline nro¢rams <br />and continuing programs should be designed to generate the data <br />required plus a degree of insurance and not ,jest data for data's <br />sake. <br />It should be noted that the quarry mine site ref].ec_ts._more <br />r <br />than seventy years of mining without reclamation Aftorts, and <br />more than twenty years of modern, heavy eq~.iipment mining with- <br />out long ran ;e planning for maximum life expectancy or nrniected <br />land use after mining, In 197l~, a long range m.inin¢ and land <br />use plan was initiated, Bence, baseline data for many original <br />ecotypes is not available, But information identifying existing <br />types that caill be rained as well as types s>>rronndinr., the mine <br />are available for data collection-- important in case of beauro- <br />cratic rebuttal, <br />The fo11o~:~inR baseline data inventory and action plan format <br />was selected to compare with the Coaldale quarry baseline pro¢ram <br />in order to make recommendations for the futiire,l <br />~. <br />