My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136024
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:43 PM
Creation date
11/26/2007 4:06:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Permit File
Doc Date
3/14/1979
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For example, inventories and subj9ct matter woiild..be different .. _. <br />when comparing a uranium mine operation with a coal strip mine <br />operation, and su.b,jact priority would chana_.e if contemnlatine a <br />uranium mill, <br />A total baseline study, formulated with respect to specific <br />priorities, consists of the gathering of contemporary information <br />and bacltgro~_ind material, site specific investigations. and <br />monitoring programs to establish conditions which may vary anrnrally <br />with seasonal chances, Thus, the initial step in planning and <br />designing to include all the environmental sciences is r9co~n- <br />izin,r, the agencies grid therefore the rernilations that determine <br />the level of information required to be generated and/or main- <br />tained. This requires not only an understand in? of those reg- <br />ulations, b,rt of the agency administrators or directors and their <br />staffs on a one to one basis, It requires definite s~zb.iective <br />r e a s onin.r__ , -4 ____ <br />Unfortunately, the author was unable to become familiar <br />with personal from the Colorado Mined Land Reclamation &,ard' %/ <br />~ ~, <br />', staff during the snruner of 1978. ldeither ~-rare the new revised ' <br />~~~r O <br />"Rules and Regulations" (effective July, 1978) obtained until <br />Auiust of 178, Familiarization of future quarry reclamation ~~ <br />personal ti-iith the staff as well as the ret*~xlations is a certai~ <br />recommendation, <br />After the initial planning phase, background material can <br />be collected, site specific investigations made, and monitoring <br />
The URL can be used to link to this page
Your browser does not support the video tag.