Laserfiche WebLink
<br />GOLD HILL MILL <br />BOND CALCULATION <br />BY J. WAYNE TATMAN <br />FROM WILLIAM C. YORK-FEIRN <br />MILL SITE <br />mill tailings <br />bldg. dam structure <br />3.31 ac. - 0.19 ac. - 0.83 ac. = 2.29 ac. <br />Regrading the area - 4 hra. @ $85/hr. <br />Spread 3" topsoil <br />(.25' x 99,752 aq. ft. = 924 cu. yds. <br />5% grade downhill <br />Haul 924 cu. yds. topsoil <br />$60/15 cu. ydaJtrip $ 41 tripe <br />624 cy. <br />Buy 624 cu. yds. @ $14/cu. yd. <br />Seeding, mulching, fertilizing <br />@ $550/ac. s 2.29 ac. <br />TOTAL <br />_ $ 340.00 <br />$ 188.00 <br />_ $ 2,496.00 <br />_ $ 8,726.00 <br />_ $ 1,259.00 <br />$12,987.00 <br />~x~f'lA~r.D-•~xe.r~ ~ <br />