Laserfiche WebLink
<br /> <br />durin5 the mining_ooeration and prior to final reclamation. Describe and show the location of erosion <br />control and sediment retention structures and provide plans for the construction of each one. <br />4. The access road is stated, although not shown in [his application, [o be from B Street, which is to the north. <br />To access this site the road would have [o cross a tributary of Fountain Creek. Please provide your plans to <br />cross the tributary. The tributary has a very large drainage area. The size of the drainage area should be <br />considered in designing the creek crossing. Rule 6.3.3(e) <br />EXHIBIT D -Reclamation Plan <br />1. The Division has reviewed your reclamation cost figures and they are adequate given that revegetation is a <br />success, however the Division has added an amount to cover costs in the event of a 50% failure of the <br />revegetation attempt. Also, we have revised the seeding rates. The Financial Warranty amount we have <br />calculated is $12,000.00 <br />2. The EI Paso County Soil Conservation District is concerned about control of noxious weeds in the permit <br />azea. The Division recommends that you contact the local weed control agency to determine if a weed <br />control plan should be included as part of your application/permit. <br />3. Your seeding rates are about 1/2 of the N.R.C.S. recommended drill seeding rate for a critical area <br />planting. I have changed the required seeding rates as follows: <br />Pubescent Wheatgrass -Luna 15% 2.1 PLS/AC <br />Smooth Brome Grass - Manchar 70% 9.1 PLS/AC <br />Western Wheatgrass - Arriba 15% 2.4 PLS/AC <br />EXI-IIBfI' L -Permanent Manmade Structures <br />The agreement in No. 1 above is signed by Classic Communities. Provide evidence that Classic <br />Communities isone-and-the-same as Pulpit Rock Investments, LLC or change the agreement to include <br />the applicant name and authorized signature. <br />