Laserfiche WebLink
September 16, 2002 <br />Regulatory Agency: Railroad Commission of Texas <br />Violation 031A The permittee conducted mining activities in the watershed of a sedimentation <br />pond prior to its being certified by a registered professional engineer to be <br />constructed as designed and as approved in the reclamation plan. <br />Action: The permittee shall immediately cease all mining activities in the E area until the <br />Commission has received documentation from a registered professional engineer <br />certifying that Pond 031 was constructed as designed <br />Terminated: September 17, 2002 <br />Fine Assessed: $300.00 <br />Texas, Jewett Mine, Permit 32E <br />MSHA #41-03164 <br />January 10, 2003 , <br />Regulatory Agency: Railroad Commission of Texas <br />Violation #032A The permittee re-constructed an intermittent stream (watershed greater than 640 <br />acres) prior to submittal and approval by the Commission of detailed design <br />plans. <br />Action: The permittee shall submit to the Commission a detailed hydrologic reclamation <br />plan for the entire watershed of re-constructed Mine Creek from upstream the <br />Terminated: <br />Final Termination: <br />Texas, Jewett Mine, <br />MSHA #41-03164 <br />January 10, 2003 <br />Regulatory Agency: <br />Violation #033A <br />Action: <br />Terminated: <br />Texas, Jewett Mine, <br />MSHA #41-03164 <br />January 23, 2003 <br />Regulatory Agency: <br />Violation #034A <br />Action: <br />Terminated: <br />Texas, Jewett Mine, <br />MSHA #41-03164 <br />November 12, 2003 <br />Regulatory Agency: <br />Violation #037A <br />f'R-4 <br />{{N <br />inlet of Pond 009. <br />On January 30, 2003, RCT Modification extended the time for abatement for 90 <br />days to April 10, 2003, the requested additional time necessary for the <br />development and implementation of corrective actions and the approval of <br />submitted plans for cited area. <br />April 15, 2003, Fine Assessed $2,000 <br />Permit 32E <br />Railroad Commission of Texas <br />The permittee failed to submit to the Commission, for approval, engineering <br />plans and specification prior to construction of an impoundment (Area B). <br />The permittee shall reclaim this pond or submit to the Commission engineering <br />plans and specifications. <br />February 24, 2003; Assessed fine $360 <br />Permit 47 <br />Railroad Commission of Texas <br />The permittee used a primary road before completing construction and <br />certification. <br />The permittee shall cease use of the E Area Haul Road until construction is <br />complete and it has been certified. <br />January 31, 2003, Assessed fine $280 <br />Permit 47 <br />• <br />• <br />Railroad Commission of Texas • <br />The permittee failed to pass surface drainage from mine spoil through a siltation <br />structure before leaving the permit area. <br />2.03-8 (Revised 3/6/04) <br />