Laserfiche WebLink
(g) No new roads will be constructed. However, there will be some slight <br />improvements to the existing roads for better and safer access to the pit <br />site. <br />(h)No water will be encountered or used in conjunction with this proposed <br />operation. <br />(i) As stated in item (h) no ground water will be encountered and no surface <br />---water-will be effected. All mining-will-be-halted-well above ground water - <br />table. <br />(j) Not Applicable <br />(k) Not Applicable <br />(1) Berms will be built around all fuel, oil, antifreeze (if needed) to prevent <br />runoff to the pit or surrounding areas. The fuel, oil, and antifreeze storage <br />area will be located in one area for the life of the mine and will be well <br />maintained to prevent any damage to the area. <br />(m)The material mined will be processed on site using screen plants, crusher <br />plants and conveyors. The material will be mined and fed into the plants <br />with dozers and loaders. The material will be crushed and screened and <br />shipped from the site by trucks. No chemicals or water will used to <br />process the material. <br />(n)The primary commodities to mined extracted by the proposed operation <br />will be sand and gravel used for the purpose of road construction and <br />improvements. <br />(o) There are no secondary or incidental commodities. <br />