Laserfiche WebLink
sheet 1 of 2 <br />I • <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WOt2K <br /> ,; <br />;: f ~ ; , ,y~ ~ ! <br />, <br />PROJECT IDENTIFICATION <br /> <br />Agency or organ'rzation name : CDMG <br />Task # : 049 State :Colorado Permitfjob # : C-1980-005 <br />Date : 12/01/2005 County :Rout[ Abbreviation :none <br />User : SLB Site :Seneca li Mine Filename :0005-049 <br />Permit or other job action :Technical Revision 37 <br />Task description : Dist-bute TSS 11 fo Road E5A <br /> <br /> <br />HOURLY EQUIPMENT COST ~:. ,:' ~ ~ ' f;: ..~;j <br /> Shift basis : 1 per day <br /> Equipment Desuiption <br />• <br />COS[ BfE <br />Scraper work team -Scraper :ICat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area aNA <br />-Dump area .NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck WaterTanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ovmerhip cosUhour : $76.44 NA NA NA $34.94 $56.94 <br />Operating costlhour : $166.38 NA NA NA $42.36 $93.74 <br />Ripper op.cosVhour: NA NA NA NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support : $0.00 Maintenance : $281.11 <br />Total work team cost/hour : $1.380.99 <br />., '~ L <br />MATERIAL QUANTITIES <br />Initial <br />volume: 38,998 LCY <br />• Source of quantity takeoff :Table <br />Source of estimated swell factor : NA <br />Swell Loose <br />factor : NA volume <br />3-2-6, SCC FPC "TS REPL - Il" <br />38,998 LCY <br />/3-/-79 <br />