Laserfiche WebLink
HOURLY PRODUCTION <br />• Hauling Caoaciri <br />Scraper Payload (weight) Basis <br />Material weight : 2, 075 pounds/LCY <br />Material description <br />USER-PROVIDED WEIGHT DATA <br />sheet 2 of 2 <br />oq $' <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />• <br />Cycle Time <br />Scraper loading time' : 1.00 <br />Maneuver and spread time : 0.60 <br />'bad time per scraper pair on push-pNl models <br />Travel time <br />Road condition description :Rutted dirt, <br />Haul Route <br />Scraper Bowl (volume) Basis <br />~ Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted cepaaty : 26.00 LCY "" <br />"' hoary production reflects volume per scraper pair on push-purl models <br />'Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper ~ Push dozer I Source <br />minutes Attitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA ~ (Cat HBJ <br />Net correction : 0.830 NA i <br />little maintenance, no water, 2" fire penetration <br />Seg. # Haut distance (feet) ~ Grade (%) Rolf. res. (%) Totaf res. (%} ~ Velocity (fpmj Travel time (min.)" <br />1 1,700 9.10 5.00 14.10 657 1.69 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.69 minutes <br />Return route <br />"travel time for each segment is adjusted for acceleration/tleceleraaon. Return time : 0.44 minutes <br />table velocities are max attainable per total resistance shovm, not average ~ , - <br />Total scraper team cyGe time (load + haul + maneuver and spread + return) : 3.72 minutes <br />Unadjusted unR productionlhour : 837.64 LCY/hour "` Adjusted for job conditions : 695.24 LCY/harr <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 695.24 LCY/ttour <br />Adjusted muRiple scraper team (fleet) hourly production : 1,390.48 LCY/hour <br />• JOB TIME AND COST <br />Fleet size : 2 Team(s) <br />Unit cost : $0.993 /LCY <br />Total job time : 4.$7 Hours <br />Total job cost : $6,643 . <br />/3-l-78 <br />