My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />• Hauling Caoacitv <br />Scraper Payload (weigh) Basis <br />Material weight : 2,075 pounds/LCY <br />Material description <br />USER-PROVIDED WEIGHT DATA <br />Rated payload : 75,000 pounds <br />Payload capacity : 36.14 LCY <br />• <br />Travel time <br />Road condition description :Rutted dirt little maintenance, no water 2"tire penetration <br />Haul Route <br />er Bowl (volume) Basis <br />sheet 2 of 2 <br />Oil, <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "' <br />produgion reflects volume per scrper pair on push-putt models <br />Cvcle Time : ;Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> ~ Saaper Push dozer Source <br />Scraper loading time' : 1.00 minutes Altitude adj. ;~ 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job etfitdency : 0.830 NA (Cat HB) <br />• load time per scraper pair on push-pull models Net (ArteCtiOn : 0.830 NA <br />Seg. # Haul distance (feet) ~ Grade (%) Roll. res. (°k) Total res. (%) ~ Vekxaty (fpm) Travel time (min J" <br />1 1,800 25.00 5.00 30.00 267 6.74 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : <br />Retum route 6.74 minutes <br />1 1,800 -25.00 5.00 -20.00 ~~~ 1201 1.63 <br /> <br /> I <br /> <br /> <br /> <br /> <br /> <br />•• travel tlme kr each segment is atllusted for accelereflon/decelefaflon. Retum time : <br />table velocities are max. attainable per total resistance sham, not average <br />Total scraper team cycle time (loatl + haul + maneuver and spread + return) : <br />Unadjusted unit produdionlhour : 312.80 LCY/ltour "' Adjusted for job conditions : <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : <br />Adjusted single scraper team (unit) hourly production : <br />Adjusted multiple scraper team (fleet) hourty protttx3ion : 1.63 <br /> <br />9.97 <br />259.62 <br />2 <br />259.62 <br />519.25 minutes <br /> <br />minutes <br />LCYflwur <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />• JOB TIME AND COST ~ i <br />Fleet size : 2 Team(s) Total job time : 77.61 Hours <br />Unit cost : $2.660 /LCY Total job cost : $107,179 <br />~i: ; :'; + :;; <br />:i, <br />/3-/- 7~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.