Laserfiche WebLink
Sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Task # <br />Date <br />User <br />Agency or organization name : CDMG <br />046 State :Colorado <br />12/01/2005 County :Routt <br />SLB Site :Seneca li Mine <br />Penn~ob # : C-1980-005 <br />Abbreviation :none <br />Filename : 0005-046 <br />Permit or other job action :Technical Revision 37 <br />Task description :Distribute TSS LL to Wadge Pit <br />~~. ~ ~ <br />~~ I~ ~ i <br />HOURLY EQUIPMENT COST <br />• <br />Cost Bn <br />Shift basis : 1 per day <br />Scraper work team -Scraper Cat 637G w/push-pull <br />-Push dozer:.N~A <br />Support equipment -Load area !NA <br />-Dump area :iNA <br />Road maintenance -Motor grader JCAT 14H <br />-Water truck :Water Tanker, i0, 000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support EquiWnent <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ovmerhip cosUhour : $76.44 NA NA NA $34.94 $56.94 <br />Operating rost/hour : $166.38 NA NA NA $42.36 $93.74 <br />Ripper op.cosUhour: NA NA NA ~ NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $109.27 $171.84 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,099.87 Support: $0.00 Maintenance : $281.11 <br />Total work team wsVhour : $1,380.99 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 40,299 LCY factor: NA volume : 40,299 LCY <br />. Source of quantity take-off : SCC Table 13-2-6, FPC "TS REPL - LL" <br />Source of estimated swell factor : NA <br /> <br />/3-/- 73 <br />