My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135380
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:06 PM
Creation date
11/26/2007 3:24:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Doc Name
Bond Calculation
Section_Exhibit Name
Tab 13 Attachment 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />'i'I , <br />Task # <br />Date <br />User <br />025 State :Colorado <br />12/01/2005 County : Routt <br />SLB Site :Seneca li Mine <br />Perm~ob# : C-9989-005 <br />Abbreviation :none <br />Filename :0005.025 <br />Agency or organization name : CDMG <br />Permit or other job adion :Technical Revision 37 <br />Task description :Grade last 2 Wolf Creek spoils (SCC Task WC-7) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 U Horsepower : 850 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br />Ufilization <br />C I <br />• <br />Cost Breakdown : Ownership cost/Fwur <br /> Operating cosi/hour <br /> Ripper op. cost/hour <br /> Operator costRrour <br /> Total unit cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 431,700 CCY fador <br />Data source : (CRG) <br />$97.60 NA <br />$188.40 100 <br />$0.00 NA <br />$31.78 NA <br />$317.79 Total fleet cosUhour <br />', <br />$317.79 <br />~. <br />Loose <br />1.153 volume : 497,750 LCY <br />Source of estimated volume :SCC Task WC-7 <br />Source of estimated swell fador :SCC Task WC-7 <br />HOURLY PRODUCTION Job Condition Corredion Fadors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 90 feet ~ Material consistency : 1.10 I (Cat HB) <br />Unadjusted howdy produdion : 3,155.8 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshitUday) <br />Partly consolidated stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.22 ~ (Cat HB) <br />Average push gradient : 10.00 % (nag) ~ Altitude : 0.93 (Cat HB) <br />Average site akitude : 8,300 feet Material weight : 0.69 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,342 Ibs/LCY ~ Net correction : 0.53 <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.189 lLCY <br />Adjusted unit produdion <br />Adjusted fleet produdion <br />Total job time <br />Total job cost <br />1677.32 LCY/hr <br />1,677.32 Lcvlnr <br />296.75 Hours <br />$94,304 <br />"i <br />/3-/- yo <br />
The URL can be used to link to this page
Your browser does not support the video tag.