Laserfiche WebLink
CIRCES Cost Estimating Software <br />• BULLDOZER WORK <br />I ' '~" <br />`'''lia_ i i .'' <br />PROJECT IDENTIFICATION <br />Task # : 024 <br />Date : 12/01/2005 <br />User: SLB <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description :Doze adjacent 2 spoils into Wolf Creek Pit (SCC Task <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County : Routt <br />Site :Seneca !i Mine <br />Basic machine : Cat D11 R - 11 U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :NA <br />Cost Breakdown <br />• MATERIAL QUANTITIES <br />Initial <br />volume : 791, 500 <br /> Utilization % <br />Ownership cosOhour : $97.60 ~ NA <br />Operating cosUhour : $188.40 100 <br />Ripper op. costRrour : $0.00 NA <br />Operator cosUhour : $31.78 NA <br />Total unit cosVhour : $317.79 Totat fleet cosUhour <br /> ~ i <br />$317.79 <br />f'T_T <br />Swell Loose <br />BCY factor ; 1.153 volume : 912,600 LCY <br />Source of estimated volume :SCC Task WG6 <br />Source of estimated swell factor :SCC Task WC-6 <br />.~ ii I ~' ilii ~ n ,a ~ '~~:~ ~ i ~ ~I'J I ~ )~ -)ill II~~ f- I s,.~ <br />HOURLY PRODUCTION Job Condition Cortection Factors Source <br />Average push distance : 250 feet <br />Unadjusted howdy production : 1,269.9 LCY/hr <br />Material consistency description <br />Panly consolidated stockpile <br />Average push gradient : 10.00 % (i <br />Average site attitude : 8,300 feet <br />Material weight : 3,342 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />. JOB TIME AND COST <br />Fleet size <br />Unit cost <br />Operator skill : 0.75 (avg.) <br />Matedal consistency : 1.10 (Cat HE <br />Dozing method : 1.20 (slot) <br />vsibilily : 1.00 (avg.) <br />Job efficiency : 0.83 (l shilt/d; <br />Spoit pile : 0.90 (ssd-fc <br />Push gradient : 1.22 (Cat HE <br />Altitude : 0.93 (Cat HE <br />Material weight : 0.69 (user) <br />Blade type : 1.00 (S/SU/E <br />Net cortection : 0.58 <br /> <br />Adjusted unit production : 733.42 LCY/hr <br />Adjusted fleet production : 733.42 LCY/hr <br /> <br />1 Dozers) <br />$0.433 /LCY <br />/3-/- 39 <br />Perm~ob#:C-1981-005 <br />Abbreviation :none <br />Filename :0005-024 <br />Total job time <br />Total job cost <br />1244.31 Hours <br />$395,425 <br />,i, i;i , <br />Horsepower: 850 <br />Shift basis : i per day <br />Data source : (CRG) <br />