My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135266
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:00 PM
Creation date
11/26/2007 3:16:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Permit File
Doc Date
6/11/1999
Doc Name
FAX COVER FAX COVER OUTLINE OF RESPONSE TO 5/19/99 ADEQUACY REVIEW LETTER
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-11-1999 11 :31 AM FROM AOCO/BAYER/CHEROKEE 303 452 4515 p. -7 <br />.~ <br />26. The estimated reclamation costs will be revised to reflect the commitments made <br />previously in this fax for your review and approval. Once you have approved <br />these revised costs, these will be included in Exhibit L -Reclamation Costs. <br />27. Exhibit S will add the other struttures that you identified as being within 200' of <br />the permit boundary. In addition, both Exhibit D -Mining Plan and Exhibit C-2 <br />- Mining Plan Map will incorporate the following changes: <br />(A) A 200' setback from the PSCo. towers will be shown that can only be <br />modified by either an agreement with PSCo. or approval by the DMG staff <br />based on a revised Stability Analysis. This should adequately address Mr. <br />Sorenson's item # 1 in his April 23, 1999 memo. <br />(B) The setback from the Fulton Ditch will be adjusted to correspond to Mr. <br />Sorenson's comment by showing and describing in the text a 65' setback <br />from to the Ditch. <br />(C) A 200' setback from the Sinclair Pipeline will be shown, that can only be <br />modified by either an agreement with Sinclair Pipeline, or approval by the <br />DMG staff based on a revised Stability Analysis and a plan to install the <br />appropriate monitoring devices (strain gauges, inclinometers, etc.) that the <br />DMG deems acceptable. <br />(D) Soil core data will be submitted demonstrating 30'± to bedrock. <br />(E) The temporary excavation slope will be modified on the maps and text to <br />be a potentially straight vertical excavation, and TuttleApplegate will base <br />any revised Stability Analysis calculations on a temporary vertical <br />excavation. <br />(F) A statement that both the subsurface utilities and the setback from each <br />utility will be locaud and staked in the field prior to beginning operations <br />in an area neaz such a subsurface utility. <br />Please call me and we can go over each item and get agreement on what is required, <br />before I revise the text and maps appropriately. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.